Late last year, I compared Cisco's S3260 Storage Server to Amazon's S3 service. The results shocked a lot of people and spurred a lot comments on the blog.

It's worth repeating from the last conversation on this topic that there is a long list of pros and cons between the on-prem and public cloud approach that will influence your decision. Depending on your individual situation there are factors that will favor one option over the other. Here we're just trying to get a clear-eyed view of basic cost elements.

If you are considering replacing, upgrading, or buying a new computing solution, you've probably come across hyperconverged infrastructure as well as public cloud offerings and are wondering which to choose. HyperFlex Systems (HX-Series) is Cisco's hyperconverged infrastructure platform.

I wanted to find out what a large, highly virtualized server environment would cost with either HyperFlex or Amazon's EC2 service over three years.HyperFlex can save you 50% or more.Now that I have your attention, keep reading!

Configuring the Public Cloud

Amazon offers 57 different instance types. After a discussion with some system architects and consulting system engineers, the m4.large instance type was chosen as a good general purpose VM for us to base this comparison on. Amazon describes it as "a high level of consistent processing performance on a low-cost platform." It has 2 vCPUs and 8GiB of RAM. There is also different networking performance for each instance type which will not factor into the comparison here, but you should factor into your choice.

For each EC2 instance, we need to add EBS storage which can be SDD (gp2 or io1) or HDD (st1). We'll keep our storage requirement modest at 100GB gp2 (general purpose) per VM.

Configuring HyperFlex

When sizing the number of VMs that can be placed on a HX node, there are three sizing items to consider: CPU, memory, and disk space. You also have to take into account the overhead for the virtualization (VMware vSphere) and HyperFlex Data Platform software. You should also consider storage performance. The cluster I will describe below is capable of 100 IOPS per VM but I don't include the cost of provisioned IOPS on the AWS side.

Using the Intel?Xeon?E5-2650 v4 CPU and 24x 32GB DIMMs, I have 171 vCPUs and 696GiB of memory available per node after accounting for the overhead. After adding in the memory overhead for the VM itself, a node would support 85 VMs maxing out the memory and CPU resources. This is without over provisioning of the memory or CPU.

For HX storage, I'm using the HX240c M4 All Flash Node which have 10x 3.8TB SSD drives. For resiliency, I set the replication factor to three, which allows for two simultaneous node failures in the cluster of eight nodes. Eight nodes will provide ~85.68TiB of usable space. For the purposes of this blog, I'm assuming no capacity benefits from compression or deduplication, even though customers are seeing an average of 48% increase in effective vs. usable capacity.

HyperFlex, unlike other hyperconverged platforms, has the unique ability to flexibly scale compute and capacity independently. This ability allows you to better match your resource needs with the right server type. My eight HC240c M4 All Flash Nodes support 680 VMs before exhausting their memory and CPU. Since I'm memory/CPU constrained in this example, I added two B200 M4 Blade Servers. This will balance out the compute and storage resources. On my 10 node mixed HyperFlex cluster, I can support 850 VMs with 2 vCPUs, 8GiB RAM, and 100GB of storage.

The Results

So what is a VM with two vCPUs, 8GiB RAM, and 100GB storage going to cost me per month?$40 for HyperFlex,$83 for Amazon paid upfront, or$133 on-demand. Amazon has different pricing models: on-demand, one and three year commitments with partial or all upfront payments.1The most expensive of these is on-demand, but it offers the most flexibility. The least expensive is three year commitment, paid all upfront. Let's not forget data transfer out to the internet charges. I have omitted them in the spirit of a fair compare. Without them, this comparison probably understates the public cloud costs, perhaps dramatically for some application scenarios. For example, if you were to transfer as little as 1TB per month, per VM, you could add $2,817,342 to your total bill.

When in doubt, I factored things conservatively in favor of public cloud.  For example, I used VMware vSphere 6 Enterprise Plus instead of the less expensive Standard edition, which also impacts the support cost. I applied IT labor costs to the on-prem side of the equation for deployment and on-going management of the physical servers.  I included the cost of Fabric Interconnects, but if you are already a UCS customers, you can add HyperFlex to your existing Fabric Interconnects. Lastly, if you already have a data center, would the addition of a HyperFlex cluster really increase your overhead to go up significantly beyond the incremental power and cooling?

So turning the crank with all of those assumptions, what is the result? Over three years,HyperFlex will save you 51% -70% over AWSwhen running 850 VMs with two vCPUs, 8GiB RAM, and 100GB storage.

I've broken down the cost assumptions below so you can check to make sure I'm not cherry picking the cost elements. While the percentage of savings (and number of VMs per HX cluster) will differ, using three year all upfront pricing, the: t2.small, t2.medium, t2.large, m3.medium, m3.large, m3.xlarge, m3.2xlarge, m4.xlarge, m4.2xlarge, m4.4xlarge, m4.10xlarge, and m4.16xlarge will all cost more than our example HyperFlex cluster.

Final Thoughts

It was correctly pointed out in the responses to my S3260 blog that public cloud provides levels of immediacy and multi-site resiliency (if you pay for it) that are difficult to replicate on-prem. On the flip side, some customers can't put certain data types in the cloud, or might have application latency requirements that the cloud can't provide. How these factors translate into cost will clearly vary from customer to customer, depending on the applications and business models in play.  In terms of resiliency, the on-prem costs modeled here cover everything short of a complete site failure (think hurricane). This cluster can tolerate a failure of two storage nodes and the loss of a Fabric Interconnect. Public cloud can buy you multi-site peace of mind with no additional hassles and that's something that might well be worth the cost premium to you.  But it's pretty clear that you can save a bundle keeping things on prem....and if you have a ballpark understanding of your growth needs you can use a "cloud in a can" solution like HyperFlex to get very close to public cloud in terms of ease of scaling and speed to deploy.

What if you don't have large VM environment, but a small one? HyperFlex may still be right for you. A three node cluster supporting only 255 VMs is 37% less than the equivalent AWS solution paid all upfront.

I would encourage you to reach out to your Cisco account team or partner to see if a HyperFlex solution might be a good fit for your environment.

 

Additional Resources

It's not as if the blog wasn't long enough already but I thought I would point to a few other items for your consideration.

Chalon Duncan has a great blog that address the strategy of public cloud, private cloud, or both.

Kaustubh Das' blog on the performance benefits of the HyperFlex All Flash solution as documented by ESG and is worth a review.

Lastly, there is a great TechWiseTV episode on the HyperFlex All Flash announcement.

 

1 There are also spot instances and dedicated hosts. Neither were germane to this analysis. Spot pricing can fluctuate every five minutes so can't be readily modeled. Dedicated hosts are even more expensive than on demand and reduces your flexibility.